LA 10/605 Direct Connector

Details

Location

Caltrans District 7, Los Angeles County

COMPLETION DATE

2015

MATERIALS

Post tensioned concrete

ENGINEERING CONSIDERATIONS

Post tensioned box girder bridge, high seismic loads

SIZE

3500ft flyover

PROJECT COST

$55 million

CLIENT

Caltrans design-build program

KEYWORDS

Quality Management, bridge, concrete

Description

Lori Burne, SE, served as Design Quality Assurance Manager for this major interchange design-build project. The project replaced the existing at-grade southbound connector with a one-lane flyover direct connector, realigned portions of the interchange connectors, and modified portions of Dalewood Street in the City of Baldwin Park.